TWO MEMBRANES IN ONE TOUGH COMPOSITE SYSTEM |
|||||||
![]() Features Excellent Durability The result of the unique field installed Composite Design. |
|||||||
|
The Components:
BASE MEMBRANE ECOLINE-S A spray-applied, high-build, exceptionally flexible, monolithic membrane that is the pliable, bonding gasket in the system. TOP MEMBRANE ECOSHIELD-E15 An extremely tough, puncture and abrasion resistant poly-olefin sheet good that protects the other components from other construction damage and whose roll dimension 12ft x 120ft minimizes the number of seams in the protection course. OPTIONAL TOP MEMBRANE A lightweight roofing felt may be used when a bond breaking surface is not desired, such as for thin-set grout. OPTIONAL DESIGN ECODRAIN-S A high compressive strength polystyrene drainage composite for tile or paving unit construction. |
|||||||
|
|||||||
|
The Installation Steps:
Step 1 Detailing Treat all cold joints (both 90 and 180 degree) by applying a coat of ECOLINE-R, embedding fabric 3-inches on each side of seam in it and then applying a second coat over the fabric. Treat all penetrations in the same fashion, except applying 6-inches on to the penetration and field with fabric and ECOLINE-R. Fill all honeycombs, rock pockets, and missing mortar joints with hydraulic cement or rapid set grout. Step 2 Base Membrane Place spray-markers every 12-ft. in all directions. (a) Begin spray application of ECOLINE from the lowest point on horizontal plane. (b) Spray application pattern should be in 4ft x 4ft passes to a 20-mil build each pass. Step 3 Top Membrane Lay ECOSHIELD in same direction of the treated control joints. Treat both sides of overlaps with ECOLINE-R and compress with roller. Apply ECOSHIELD-TAPE along seam overlapping two-inches on each side. Terminate to exterior perimeter substrate by turning a six-inch flap up and applying seam sealer to flap and substrate and then attaching a termination bar to the flap and substrate. |
|||||||
![]() |
|||||||
|
|||||||