A COMPREHENSIVE ENVELOPE DESIGN IN ONE SYSTEM |
|||||||
![]() Features Slab Protection The result of the below-slab sheet good or drainage mat. |
|||||||
|
The Components:
BELOW-SLAB ECOSHIELD-E15 An extremely tough, non-degrading poly-olefin sheet good that comes in 12ft x 120ft rolls for easy installation with a minimum of seams that protects the slab from moisture from below. BASE MEMBRANE ECOLINE-S & R A spray-applied, high-build, exceptionally flexible, monolithic membrane that is the pliable, completely bonded waterproofing membrane in the system. MIDDLE MEMBRANE ECOSHIELD-E10 A puncture and abrasion resistant poly-olefin sheet good that protects the fluid applied membrane from other construction damage and acts as slip-sheet to handle earth movement. TOP MEMBRANE ECODRAIN-E An exceptionally durable yet pliable drainage composite that comes in 8ft x 65ft rolls which protects the other components, while providing drainage and acting as another water barrier. |
|||||||
|
|||||||
|
The Installation Steps:
Step 1 - Vapor Barrier Lay ECOSHIELD in one direction with six-inch overlaps. Treat both sides of overlap with ECOLINE-R and compress with a roller. Apply ECOSHIELD-Tape along seam overlapping two-inches on each side. Step 2 Detailing Treat all cold joints (both 90 and 180 degree) by applying a coat of ECOLINE-R, embedding fabric 3-inches on each side of seam in it and then applying a second coat over the fabric. Treat all penetrations in the same fashion, except applying 6-inches on to the penetration and field with fabric and ECOLINE-R. Treat all tie-holes by brush with ECOLINE-T. Fill all honeycombs, rock pockets, and missing mortar joints with hydraulic cement or rapid set grout. Step 3 Waterproofing Membrane Begin the application of ECOLINE-S from the bottom to top, always applying to footer or slab first. Spray application should be done in 4ft x 4ft passes to 20-mil build on each pass. All interior 90 degree, cold joints should be built up to a cant strip thickness. At exterior 90 degree, transition points including the roofline an extra pass should be made to provide a gasket to attach the other components to. Step 3 Protection Course Begin installing ECOSHIELD on the top horizontally in one direction, attaching temporarily with fasteners, and with six-inch overlaps on vertical and horizontal (top over bottom) seams. Treat both sides of overlap with ECOLINE-R and compress with a roller. Apply ECOSHIELD-Tape along seam overlapping two-inches on each side. Step 4 Drainage Course Start from top of structure and attach ECODRAIN-E to the roof and working down the walls to the footer. Secure the drainage mat at 90 degree, transitions and overlaps with appropriate fasteners. Overlap drainage mat six-inches at seams by pulling back filter fabric, applying ECOLINE-R, and snapping dimples together. On wall horizontal seams, top sheet should overlap bottom sheet. |
|||||||
![]() |
|||||||
|
|||||||