Drawing Name Description
Q-1 Air Barrier Wall Typical Cross Section
E-1 Blindside Sheet Piling Typical Cross Section
C-1 Blindside Shotcrete/Soil Nails Typical Cross Section
D-1 Blindside Soil Nails Earth Typical Cross Section
LW-7 Blindside Wall & Below Slab
B-1 Blindside/Lagging Wall Typical Cross Section
O-1 Concrete Decks for Bonded Finish
P-1 Concrete Decks for Un-Bonded Finish
N-1 Concrete Plaza Deck for Pervious Paving
CS-1 Crawl Space Envelope Waterproofing System
AB-5 Detail at Brick Veneer Wall & Roof
LW-6 Existing to New Wall
LW-13 Footing Drain Outlet
AB-3 Foundation Detail
H-1 Foundation Walls
I-1 Foundation Walls
G-1 Foundation Walls Not More than 12 Feet Below Grade
LW-15 Injection Tube Installation With Concrete Slab Placement First
LW-16 Injection Tube Installation With Shotcrete Wall Placement First
LW-12 Lagging Wall - "C" Channel Detail
S-1 Lagging Wall And Under Slab Moisture Barrier w/ Water Collection Area
LW-2 Lagging Wall Detail Exterior Soldier Beam
LW-3 Lagging Wall Detail Interior Soldier Beam
LW-11 Lagging Wall Detail Interior Soldier Beam Horizontal Tie In
LW-9 Lagging Wall Detail Moisture Barrier to Lag Wall Tie In
LW-1 Lagging Wall Detail Overlap 2
LW-4 Lagging Wall Detail Penetration
LW-10 Lagging Wall Detail Termination at Grade
LW-8 Lagging Wall Detail Termination to Slab at Grade
LW-5 Lagging Wall Tie Back
MB-2 Methane/Moisture Barrier Exterior Footer Detail
MB-1 Methane/Moisture Barrier Overlap
MB-5 Methane/Moisture Barrier Penetration Detail
MB-3 Methane/Moisture Barrier Piling Cap/Int. Footer
MB-4 Methane/Moisture Barrier Under Exterior Footer Detail
MB-6 Methane/Moisture Barrier Utility Box Detail
AB-2 Parapet Detail
J-1 Planters Concrete & Concrete Masonry
R-1 Retaining Wall And Slab Detail
AB-4 Shelf Angle Detail
K-1 Slab on Grade Methane Barrier Waterproofing Under Slab
L-1 Slab on Grade Methane Barrier Waterproofing Under Slab
M-1 Slab on Grade Mud Slab Construction
WP-7 Slab Tie-In to Planter
WP-2 System III Waterproofing Construction Joints Concrete/CMU Wall
WP-3 System III Waterproofing Crack Treatment Concrete/CMU Wall
WP-4 System III Waterproofing Penetration Concrete/CMU Wall
WP-5 System III Waterproofing Termination at Grade Concrete/CMU Wall
WP-1 System III Waterproofing Typical Detail Concrete/CMU Wall
F-1 Tunnel Overview
WP-6 Under Slab Vertical Tie In
LW-14 Vertical Tie In Of Pour In Place Wall To Lagging Wall (Top View)
AB-1 Window Detail